|
|
Recently,http://www.chhaoes.com/bbs/home.php?mod=space&uid=51800&do=blog&quickforward=1&id=676831, Ms. Lee, who lives Xibalizhuang Street calls reflected, two and a half years has built a bridge on Xibalizhuang Street so far has not been opened. Over time, residents of the nearby bridge regarded as free parking,pas cher nike tn basket nike tn pas cher, and a day to evening, there are people actually on the bridge support from the stalls, huh outdoor barbecue,hogan estate hogan estate 2014, shed spreading smoke, pollution of the surrounding environment.
■ on site
Day evening barbecue parking
Meters west of the bridge, leaving only two meters blocked exports
May 24 afternoon, the reporter along Xibalizhuang Street all the way east to find the bridge. From afar; bridge without a car,nike air max 1 essential femme pas cher nike air max noir rose, only a few pedestrians walking from the other side of the bridge. Occasionally there are a few bikes on the bridge from both sides of the ramp, slowly ride to the east in the direction of exquisite Lane. Approaching the bridge you can see, the road bridge above the streets nearly a meter, about half a meter high wall on the west side of the concrete wall, only in the north there is a less than two meters of entrances, pedestrian, bicycle,nike court tradition vente en ligne chaussures, there are a small number of van are from here.
Living on the streets of Ms. Lee told reporters: "This bridge was just built when the closure of the car and people do not let too, particularly inconvenient,http://wuliting.com/?action-viewcomment-itemid-2268, our children go to school every day to get the piece of road from the south around the back later. There are a lot of residents that street offices to coordinate on a low wall on the bridge unit opened a mouth, but also to repair a small road, people and bicycles can be in the past. "
Went to the bridge, the reporter saw,veste moncler moncler maastricht, there are hawkers and kite uncle Maibing Gun, not far from the case as well as a pool and a small shed covered with plastic sheeting. Parked on both sides of the bridge deck east side of all types of vehicles,http://509421.tw/news/html/?30895.html,air jordan basketball air jordan femme flight, there are vans, cars,http://forum.eatingistheway.com/profile/fgjhr7r2d5o, motorized tricycle, and junk trucks, reporters counted, enough to have as many as 25, so that the entire bridge deck became a free parking.
See someone on the bridge accounting position with stones, plastic buckets and other utensils, a reporter approached to ask people on the bridge billiards, these stones representing the seat of what to do? A young man side batting side and said: "Here at the stalls children are accounted seats early to chant a little better now, and then the hot weather children, even more!."
Reporters came to the evening of May 25, the bridge saw, really more of a three or four barbecue stove and a few tables. The bridge on the west side compared to their stalls, the momentum is greater,air jordan solde jordan enfant, and the scene is more lively. Sa Sa two people to patronize these two barbecue stalls,adidas f50 2011 adidas france prix, next to the table quickly filled with people, the business is truly booming, smoky stalls smoke everywhere,spaccio woolrich roma, pedestrians have their noses trip. Almost a dozen stalls filled the west side of the whole bridge, past the crowd can only detour from the side.
■ argument
Public Union:
Dangerous bridge reconstruction and road widening is not synchronized
Street Urban Management Division:
Demolition difficult hinder expansion of the road
What are the reasons causing this long 130 meters wide and 22.5 meters of the three-span bridge built in two and a half without traffic, you can not use it? Reporters from the public associated company directors say that the engineer, the bridge was originally built as a dangerous bridge,http://www.yqtxt.net/home.php?mod=spacecp&ac=blog&blogid=, after being included in the renovation plan, construction commenced in 2006, to complete the transformation by the end of 2007. In addition to the original plan bridges, the bridge is 1200 meters on either side of the road will also be widened - from Beiwa to Balizhuang Road West Fourth Ring Road, on the basis of the existing streets, widened to 30 meters roads, but today, road reconstruction has yet to start,abercrombie and fitch 2013 abercrombie vest, which lead to the use of the bridge repaired.
Xibalizhuang chief Street Office inspectors said: "The bridge was designed in accordance with the 30-meter-wide road construction, if we do not broaden the road open to traffic,hogan napoli, is sure to bring the appropriate insecurity and west eight. in the village east of Lane Street and exquisite villages are famous because widen the road involves complex demolition issue, so that the road repair delays widening the opening of the bridge will accordingly be shelved. "
■ prospects
Expanding road has been included in the plan
Residents look forward to opening soon
According to the reporter, Xibalizhuang Street and the bridge on the eastern side of the exquisite Lane housing mostly private houses. Eastbound lane exquisite seeing a seat four or five small building erected, Xibalizhuang Street side but slightly silence. When a reporter asked why, Street one resident seems very "complaint": "We dare not afraid to cover it when the expansion of the road, so that removal of self-built houses, not being paid to this child ah!!"
In this regard,http://gospogroove.com/activity/p/643875/, explained to reporters, exquisite illegally built Lane phenomenon is historical legacy, as early as ten years ago, the city government on the region as a dilapidated building project awarded to a real estate development company. But the development company has not implemented the demolition,air max homme chaussure de sport nike, thus increasing demand for rental housing in the area and more exquisite Lane Sidaluanjian intensified; contrary, Xibalizhuang side streets because of the demolition has been uncertain outlook, there is no formation of private ride chaos build climate. It is understood that, at present, land development rights exquisite Lane relevant departments have been recovered. adds,http://www.aurosiksha.org/login/index.php?item/create_form/1, "This road widening has been included in this year's transformation plan, in fact, the road plans I have seen. Currently, relevant departments are doing for the road early coordination and preparation."
Residents exquisite Street Lane and Xibalizhuang appeal, so as soon as this is now set to parking stalls, billiards case and other "multi-purpose" in one of the bridge to play its original function - the traffic,http://sj.145hao.com/?action-viewcomment-type-news-itemid-69, the surrounding residents easy access.
Newspaper reporter Sun Xiaojie correspondent Cui small millet |
|