■ Chinese Commercial News reporter Liang Chen / Wen Tang Wanli / Chart
Built in Zhengzhou City Xin Xin Yuan Yuan masters Community Primary School, in the top of the five-story building built over 500 square meters Color foam lunch room serves as the students' part. The undocumented, no fire exits lunch break Ministry, dense squeeze nearly a thousand students. The school said the school will conduct an annual fire evacuation drills,prezzi hogan, the students "should" no surprises.
■ Complaints
When the lunch room to build makeshift roof
Xin Yuan Elementary School parents questioned profit
After the last few days, Lee looked lunch portion Zhengzhou Xin Xin Yuan Yuan masters community primary school,offerte scarpe hogan, no longer afraid to let the children take a nap at school.
"Like with the nest, densely filled with beds,http://www.aqua-story.com/cgi/treasurehunter/joyful/joyful.cgi?page”, no fire exits, fire ladders do not say, windy Recently also lift the top." Lee said.
April 12 at 2 pm,hogan olympia donna,http://www.michieki.jp, this reporter went to school to see Xin Yuan, lunch at the top of the Ministry of Education Building,scarpe hogan saldi, 5th Floor, school building,prezzi hogan, a total of more than 500 square meters. The makeshift structures by Color divided into two parts,http://edgevillesupremacy.webatu.com/forum/inubbs.cgi, the west and the south,http://beegeedays.com/en/news-en/577-english.html, was divided into ten rooms lunch room.
"Lunch at the strong request of the Ministry of parents built." Xin Yuan primary school principals DISASTER that many school students Xin District Court outside, a lot of parents that transfer students inconvenient noon,hogan rebel outlet, the school will engage lunch department.
"On the south side of the roof in 2005 to build a lunch break Ministry in 2007 and on the west side of the upstairs part of the expansion, the total cost spent four or five hundred thousand." He explained that there were more than 1,200 students in the school, third grade above children in school lunch, charges 1,800 yuan per semester, which includes lunch.
Owners Xin Wang said District Court, before this semester,saldi hogan,http://bbs.ht88.me/viewthread.php?tid=638136&extra=page%3D1, the school sent to every parent with a notice, saying it was lunch Department completed,http://egassembler.hgc.jp/cgi-bin/eassembler4.cgi, ask students to check in as soon as possible.
Wang believes that the school lunch room to build this,hogan store, do not trouble already, an accident will cause Qunsiqunshang. "District where residents are aware,http://www.infocrystal.com/alink/apeboard_plus.cgi?command=read_message&msgnum=10/, what permits the cover lunch Department are not, we dare not let the children stayed inside."
Lee believes residential property owners, Xin Yuan Elementary School Department wants to make money out lunch. "One semester income 1800 yuan, is really a little expensive, we had to find a school reflect the school says it is cheap. Indeed, many private schools received only a few hundred dollars per semester."
■ on site
Hallway filled with beds, no water hydrants
Lunch at the entrance to the Ministry,hogan store, there is a fire hydrant. Reporter unscrew the hydrant valve,prezzi scarpe hogan, only to hear the sound of steaming, about 1 minute later, no water flows out.
DISASTER said, usually hydrant is not to use, for fear of meter readings increased. Then he called the teacher on duty, about half an hour later,hogan uomo prezzi,http://www.lierener.com/forum.php?mod=viewthread&tid=2639538, reporters unscrew the hydrant again, there is flowing out.
Reporters saw at the Ministry of the west side of the lunch break,scarpe hogan donna, each room of about 50 square meters,scarpe hogan scontate, and can supply more than 40 students to lunch, densely filled with three rows of bunk beds. Power lunch room and gates, fixed on to the foam plastic as a material of the corridor walls. In less than three meters wide corridors, management says that hallway bed is to let others influence the rest of naughty children sleep.
Lunch Department south where dozens of beds lined up in the hallway, extended the more than 50 meters. Put out a house within a maximum of more than 50 beds. Several houses in the back door lock is screwed dead, leaving only the front door access. The lunch department,scarpe hogan, no fire exits and fire ladder. "We are in the first week of school each year will conduct fire evacuation drills,stivali hogan, used to eliminate fire hazards." DISASTER said.
Wang said the owners, the fire drill was organized within the district,hogan uomo, has nothing to do with the school,scarpe hogan uomo prezzi, and have not seen the school lunch was held at the Ministry had evacuation drills.
■ Survey
Lunch room without formalities, the relevant departments will investigate
It is understood that the Ministry of Xin Yuan school lunch built, did not obtain planning procedures and construction,outlet hogan roma, fire permits relevant departments.
April 10,scarpe hogan prezzi, Zhengzhou Goldwater Fire Brigade received the complaints from residents. Fire officers said that after this report the situation to their superiors will, then the law of the Fire Department to investigate lunch facilities.
"Our lunch Department is currently Beilin Road neighborhood offices go through relevant procedures for building construction." DISASTER said.
Reporter consulted the North Forest Road neighborhood offices after that,store hogan, there are security risks lunch portion of the office building of the primary school but had Xin Yuan went to investigate and issued a rectification notice. Office staff said a recent visit again Xin Yuan Elementary School to see its relevant documents. (Clues provided Wang) Source: Henan Business Daily